Unit Price Desk TX
Informational only: Figures come from TxDOT's public Bid Tabulations file: bids as read at letting, not award records. They may contain errors. Not bid, cost-estimating or engineering advice. Verify with TxDOT before relying on any number.

TxDOT item 422-7022: BRIDGE SIDEWALK(HPC)

Unit: SF. Apparent low-bid unit prices for this item across 9 TxDOT lettings from 2025-03-04 to 2026-11-04.

Last 24 months

9Low bids
$14.00Median
$12.0025th pct
$21.2575th pct
$14.80Qty-weighted avg
$11.00 / $85.00Min / max
$20.00Engineer's est. median
70.8%Low ÷ estimate (median)

Last 12 months

6Low bids
$13.00Median
$11.2525th pct
$17.0075th pct
$13.40Qty-weighted avg
$11.00 / $21.80Min / max
$23.50Engineer's est. median
55.7%Low ÷ estimate (median)

Median by TxDOT district

DistrictLow bidsMedian unit price
Dallas7$18.00
Fort Worth1$11.00
Paris1$12.00

Most recent low bids

Let dateCCSJCountyDistrictQtyLow unit priceEngineer's est.
2026-11-040195-02-092DentonDallas2.29e+04$11.00$17.00
2026-10-060095-03-100KaufmanDallas1.5e+04$18.00$12.00
2026-07-010014-03-088JohnsonFort Worth9.61e+03$11.00$30.00
2026-06-030918-46-334DentonDallas1.32e+03$21.80$15.00
2026-04-070047-03-091GraysonParis4.57e+03$12.00$125.00
2026-02-041015-01-024RockwallDallas6.64e+03$14.00$30.00
2025-05-020918-47-234DallasDallas1.02e+03$85.00$20.00
2025-05-010092-13-031NavarroDallas1.68e+03$14.00$13.00
2025-03-040135-03-046CollinDallas2.16e+03$21.25$30.00

Quantities matter: small quantities often carry higher unit prices. Lump-sum (LS) items are whole-job amounts. Compare projects of similar size before using a number.

Source: TxDOT Bid Tabulations, bid code 422-7022 on the Texas Open Data Portal, retrieved 2026-11-26. JSON: /api/v1/tx/items/422-7022.json