TxDOT item 432-7004: RIPRAP (CONC)(CL A)
Unit: CY. Apparent low-bid unit prices for this item across 33 TxDOT lettings from 2024-11-06 to 2026-10-06.
1 row(s) with quantity of zero or less were left out of these statistics.
Last 24 months
33Low bids
$700.00Median
$620.0025th pct
$1,040.0075th pct
$469.09Qty-weighted avg
$282.00 / $2,788.00Min / max
$850.00Engineer's est. median
84.2%Low ÷ estimate (median)
Last 12 months
19Low bids
$700.00Median
$624.0025th pct
$1,057.6775th pct
$399.40Qty-weighted avg
$282.00 / $1,600.00Min / max
$841.00Engineer's est. median
84.6%Low ÷ estimate (median)
Median by TxDOT district
| District | Low bids | Median unit price |
|---|---|---|
| San Antonio | 6 | $489.80 |
| Fort Worth | 5 | $905.00 |
| Lubbock | 4 | $1,035.00 |
| Amarillo | 3 | $1,040.00 |
| Waco | 3 | $650.00 |
| Lufkin | 2 | $747.50 |
| Dallas | 2 | $800.00 |
| Bryan | 1 | $800.58 |
| Tyler | 1 | $1,100.00 |
| Brownwood | 1 | $700.00 |
| Odessa | 1 | $1,290.00 |
| San Angelo | 1 | $282.00 |
| Laredo | 1 | $628.00 |
| Pharr | 1 | $650.00 |
| Austin | 1 | $935.00 |
| Beaumont | 1 | $558.10 |
Most recent low bids
| Let date | CCSJ | County | District | Qty | Low unit price | Engineer's est. |
|---|---|---|---|---|---|---|
| 2026-10-06 | 0590-05-057 | Milam | Bryan | 16.3 | $800.58 | $600.00 |
| 2026-10-06 | 0168-03-040 | Parmer | Lubbock | 22.6 | $620.00 | $1,000.00 |
| 2026-08-05 | 2635-05-005 | Randall | Amarillo | 0 | $0.00 | $780.99 |
| 2026-08-05 | 0014-15-034 | Tarrant | Fort Worth | 1.25 | $905.00 | $2,000.00 |
| 2026-07-02 | 0902-90-112 | Tarrant | Fort Worth | 25 | $879.38 | $1,000.00 |
| 2026-07-02 | 0625-01-001 | Limestone | Waco | 36 | $650.00 | $841.00 |
| 2026-07-02 | 0492-04-034 | Smith | Tyler | 1 | $1,100.00 | $1,300.00 |
| 2026-07-02 | 0138-06-047 | Nacogdoches | Lufkin | 39 | $550.00 | $850.00 |
| 2026-07-02 | 0054-06-113 | Brown | Brownwood | 176 | $700.00 | $675.00 |
| 2026-07-01 | 0229-01-042 | Ector | Odessa | 182 | $1,290.00 | $515.00 |
| 2026-07-01 | 0070-03-062 | Concho | San Angelo | 3.94e+03 | $282.00 | $590.00 |
| 2026-07-01 | 0014-03-088 | Johnson | Fort Worth | 1.25 | $690.00 | $2,800.00 |
| 2026-06-03 | 0291-03-077 | Kerr | San Antonio | 22.1 | $519.59 | $500.00 |
| 2026-05-07 | 0880-04-040 | Lubbock | Lubbock | 1.25 | $1,600.00 | $1,900.00 |
| 2026-05-06 | 6497-68-001 | Potter | Amarillo | 100 | $1,335.00 | $1,355.00 |
| 2026-03-04 | 2883-01-004 | Medina | San Antonio | 6 | $1,075.35 | $527.57 |
| 2026-03-04 | 0067-01-089 | Randall | Amarillo | 6 | $1,040.00 | $700.00 |
| 2026-01-06 | 0092-08-021 | Ellis | Dallas | 72 | $600.00 | $755.00 |
| 2025-12-02 | 6472-26-001 | Bell | Waco | 3 | $650.00 | $1,250.00 |
| 2025-12-02 | 2150-04-099 | Webb | Laredo | 379 | $628.00 | $690.00 |
Quantities matter: small quantities often carry higher unit prices. Lump-sum (LS) items are whole-job amounts. Compare projects of similar size before using a number.
Source: TxDOT Bid Tabulations, bid code 432-7004 on the Texas Open Data Portal, retrieved 2026-11-26. JSON: /api/v1/tx/items/432-7004.json