Unit Price Desk TX
Informational only: Figures come from TxDOT's public Bid Tabulations file: bids as read at letting, not award records. They may contain errors. Not bid, cost-estimating or engineering advice. Verify with TxDOT before relying on any number.

TxDOT item 462-7068: CONC BOX CULV (6 FT X 5 FT)(EXTEND)

Unit: LF. Apparent low-bid unit prices for this item across 10 TxDOT lettings from 2025-02-06 to 2026-07-01.

Last 24 months

10Low bids
$1,250.00Median
$1,058.7525th pct
$1,300.0075th pct
$1,109.67Qty-weighted avg
$810.00 / $1,602.21Min / max
$1,150.00Engineer's est. median
104.5%Low ÷ estimate (median)

Last 12 months

5Low bids
$1,100.00Median
$1,045.0025th pct
$1,300.0075th pct
$1,113.00Qty-weighted avg
$895.00 / $1,330.00Min / max
$1,200.00Engineer's est. median
100.0%Low ÷ estimate (median)

Median by TxDOT district

DistrictLow bidsMedian unit price
Dallas3$1,100.00
Austin1$1,330.00
Tyler1$895.00
Paris1$1,300.00
Waco1$1,045.00
Yoakum1$1,602.21
Beaumont1$1,300.00
Fort Worth1$1,300.00

Most recent low bids

Let dateCCSJCountyDistrictQtyLow unit priceEngineer's est.
2026-07-011392-03-017CollinDallas36$1,100.00$950.00
2026-05-060151-02-026BurnetAustin20$1,330.00$1,100.00
2026-04-071388-01-010RuskTyler24$895.00$1,200.00
2026-04-070735-01-020DeltaParis16$1,300.00$1,300.00
2026-03-040724-02-024BosqueWaco24$1,045.00$1,200.00
2025-09-050747-01-018EllisDallas66$810.00$1,200.00
2025-06-050913-09-132WhartonYoakum9$1,602.21$750.00
2025-05-021014-01-013CollinDallas58$1,200.00$1,100.00
2025-03-040784-04-027OrangeBeaumont24$1,300.00$7,000.00
2025-02-060365-03-050JohnsonFort Worth27$1,300.00$1,100.00

Quantities matter: small quantities often carry higher unit prices. Lump-sum (LS) items are whole-job amounts. Compare projects of similar size before using a number.

Source: TxDOT Bid Tabulations, bid code 462-7068 on the Texas Open Data Portal, retrieved 2026-11-26. JSON: /api/v1/tx/items/462-7068.json