Unit Price Desk TX
Informational only: Figures come from TxDOT's public Bid Tabulations file: bids as read at letting, not award records. They may contain errors. Not bid, cost-estimating or engineering advice. Verify with TxDOT before relying on any number.

TxDOT item 476-7011: JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)

Unit: LF. Apparent low-bid unit prices for this item across 8 TxDOT lettings from 2024-12-03 to 2026-10-06.

Last 24 months

8Low bids
$1,140.00Median
$600.0025th pct
$1,725.0075th pct
$883.61Qty-weighted avg
$350.00 / $1,925.00Min / max
$1,650.00Engineer's est. median
78.6%Low ÷ estimate (median)

Last 12 months

6Low bids
$725.00Median
$500.0025th pct
$1,310.0075th pct
$719.08Qty-weighted avg
$350.00 / $1,800.00Min / max
$1,825.00Engineer's est. median
64.2%Low ÷ estimate (median)

Median by TxDOT district

DistrictLow bidsMedian unit price
Dallas3$1,700.00
Laredo1$650.00
Fort Worth1$800.00
Austin1$1,800.00
Abilene1$350.00
Houston1$1,480.00

Most recent low bids

Let dateCCSJCountyDistrictQtyLow unit priceEngineer's est.
2026-10-060095-03-100KaufmanDallas265$450.00$600.00
2026-08-060018-05-089WebbLaredo779$650.00$1,925.00
2026-07-010014-03-088JohnsonFort Worth139$800.00$1,500.00
2026-06-030337-01-053WilliamsonAustin99$1,800.00$1,850.00
2026-06-030006-06-109TaylorAbilene101$350.00$1,925.00
2026-02-040050-06-092HarrisHouston58$1,480.00$1,800.00
2025-03-040135-03-046CollinDallas114$1,925.00$820.00
2024-12-030047-05-057CollinDallas145$1,700.00$1,200.00

Quantities matter: small quantities often carry higher unit prices. Lump-sum (LS) items are whole-job amounts. Compare projects of similar size before using a number.

Source: TxDOT Bid Tabulations, bid code 476-7011 on the Texas Open Data Portal, retrieved 2026-11-26. JSON: /api/v1/tx/items/476-7011.json