Unit Price Desk TX
Informational only: Figures come from TxDOT's public Bid Tabulations file: bids as read at letting, not award records. They may contain errors. Not bid, cost-estimating or engineering advice. Verify with TxDOT before relying on any number.

TxDOT item 666-7346: PAVEMENT SLER 4"

Unit: LF. Apparent low-bid unit prices for this item across 49 TxDOT lettings from 2024-11-06 to 2026-11-03.

Last 24 months

50Low bids
$0.43Median
$0.2525th pct
$1.0075th pct
$0.49Qty-weighted avg
$0.10 / $8.00Min / max
$0.75Engineer's est. median
64.1%Low ÷ estimate (median)

Last 12 months

20Low bids
$0.30Median
$0.1925th pct
$0.9375th pct
$0.50Qty-weighted avg
$0.10 / $8.00Min / max
$0.59Engineer's est. median
50.0%Low ÷ estimate (median)

Median by TxDOT district

DistrictLow bidsMedian unit price
Dallas16$0.28
San Antonio10$0.31
Austin5$0.50
Abilene3$1.20
Waco3$0.35
Houston2$5.00
Atlanta2$1.00
Bryan2$0.38
Beaumont1$0.25
Wichita Falls1$0.10
Paris1$1.50
Laredo1$0.90
Tyler1$1.00
Amarillo1$6.32
Fort Worth1$0.10

Most recent low bids

Let dateCCSJCountyDistrictQtyLow unit priceEngineer's est.
2026-11-030015-13-432TravisAustin30$0.50$1.00
2026-10-146502-76-001EllisDallas2e+04$0.10$0.15
2026-09-030918-00-440DallasDallas500$0.25$0.50
2026-09-030051-09-127GalvestonHouston18$2.00$1.00
2026-08-060920-39-028ChambersBeaumont3.48e+04$0.25$1.00
2026-07-020914-04-377TravisAustin1.67e+03$0.30$0.65
2026-07-012452-03-128BexarSan Antonio5.49e+03$0.25$0.25
2026-07-010915-12-782BexarSan Antonio5.23e+03$0.30$0.53
2026-07-010914-00-543TravisAustin362$0.30$1.20
2026-06-026500-87-001WichitaWichita Falls200$0.10$0.40
2026-06-020908-33-115TaylorAbilene925$1.15$1.75
2026-04-156495-33-001NavarroDallas2e+04$0.10$0.20
2026-04-070091-06-062DallasDallas2.86e+03$0.15$1.00
2026-03-056495-37-001DallasDallas1.5e+03$0.20$0.15
2026-03-050901-19-229GraysonParis1.95e+04$1.50$0.86
2026-03-040724-02-024BosqueWaco404$0.14$0.50
2026-02-050918-47-445DallasDallas8.96e+03$0.80$2.00
2026-02-050912-73-235GalvestonHouston698$8.00$24.00
2026-01-070922-20-031La SalleLaredo2e+03$0.90$0.40
2026-01-070910-16-193SmithTyler1.29e+03$1.00$0.51

Quantities matter: small quantities often carry higher unit prices. Lump-sum (LS) items are whole-job amounts. Compare projects of similar size before using a number.

Source: TxDOT Bid Tabulations, bid code 666-7346 on the Texas Open Data Portal, retrieved 2026-11-26. JSON: /api/v1/tx/items/666-7346.json