TxDOT item 668-7021: PREFAB PM TY B (W)(24")(SLD)
Unit: LF. Apparent low-bid unit prices for this item across 21 TxDOT lettings from 2024-12-04 to 2026-08-06.
Last 24 months
21Low bids
$34.00Median
$21.0025th pct
$40.2575th pct
$34.32Qty-weighted avg
$10.07 / $46.00Min / max
$30.00Engineer's est. median
100.0%Low ÷ estimate (median)
Last 12 months
6Low bids
$33.00Median
$32.0025th pct
$38.5075th pct
$32.53Qty-weighted avg
$21.00 / $40.25Min / max
$40.00Engineer's est. median
100.0%Low ÷ estimate (median)
Median by TxDOT district
| District | Low bids | Median unit price |
|---|---|---|
| Lubbock | 10 | $33.00 |
| Odessa | 4 | $26.50 |
| Amarillo | 4 | $42.62 |
| Abilene | 2 | $34.73 |
| Paris | 1 | $10.07 |
Most recent low bids
| Let date | CCSJ | County | District | Qty | Low unit price | Engineer's est. |
|---|---|---|---|---|---|---|
| 2026-08-06 | 0168-03-038 | Parmer | Lubbock | 595 | $34.00 | $33.00 |
| 2026-07-02 | 1502-01-031 | Lubbock | Lubbock | 1.28e+03 | $32.00 | $45.00 |
| 2026-07-01 | 0905-06-121 | Lubbock | Lubbock | 24 | $32.00 | $40.00 |
| 2026-05-07 | 0880-04-040 | Lubbock | Lubbock | 282 | $40.00 | $40.00 |
| 2026-04-08 | 0905-06-096 | Lubbock | Lubbock | 3.21e+03 | $40.25 | $40.00 |
| 2026-03-05 | 0905-00-132 | Lubbock | Lubbock | 2.35e+03 | $21.00 | $21.00 |
| 2025-10-14 | 6490-54-001 | Lubbock | Lubbock | 70 | $20.25 | $20.00 |
| 2025-10-09 | 0479-04-055 | Winkler | Odessa | 170 | $33.00 | $22.50 |
| 2025-10-09 | 0380-04-025 | Terry | Lubbock | 26 | $37.00 | $35.19 |
| 2025-10-08 | 0168-10-081 | Potter | Amarillo | 48 | $45.00 | $50.00 |
| 2025-10-08 | 0076-07-037 | Upton | Odessa | 39 | $44.00 | $40.00 |
| 2025-09-04 | 0904-00-230 | Potter | Amarillo | 682 | $46.00 | $20.00 |
| 2025-08-07 | 0901-22-130 | Hunt | Paris | 152 | $10.07 | $18.00 |
| 2025-07-01 | 0181-01-067 | Taylor | Abilene | 1.26e+03 | $42.00 | $25.00 |
| 2025-05-02 | 0379-01-050 | Hutchinson | Amarillo | 2.59e+03 | $38.50 | $17.00 |
| 2025-04-04 | 0557-01-033 | Moore | Amarillo | 4.14e+03 | $40.25 | $17.00 |
| 2025-04-03 | 0139-08-040 | Pecos | Odessa | 75 | $14.70 | $30.00 |
| 2025-03-05 | 0905-00-131 | Lubbock | Lubbock | 1.31e+03 | $20.00 | $21.00 |
| 2025-03-04 | 0005-06-125 | Howard | Abilene | 1.71e+03 | $27.45 | $30.00 |
| 2025-02-07 | 0906-00-247 | Ector | Odessa | 235 | $20.00 | $39.10 |
Quantities matter: small quantities often carry higher unit prices. Lump-sum (LS) items are whole-job amounts. Compare projects of similar size before using a number.
Source: TxDOT Bid Tabulations, bid code 668-7021 on the Texas Open Data Portal, retrieved 2026-11-26. JSON: /api/v1/tx/items/668-7021.json