TxDOT item 668-7038: PREFAB PM TY B (W)(36")(YLD TRI)
Unit: EA. Apparent low-bid unit prices for this item across 10 TxDOT lettings from 2025-03-05 to 2026-11-03.
Last 24 months
10Low bids
$61.50Median
$45.7225th pct
$107.5075th pct
$43.74Qty-weighted avg
$21.39 / $235.00Min / max
$67.97Engineer's est. median
78.4%Low ÷ estimate (median)
Last 12 months
3Low bids
$60.00Median
$42.5025th pct
$61.5075th pct
$35.56Qty-weighted avg
$25.00 / $63.00Min / max
$60.00Engineer's est. median
100.0%Low ÷ estimate (median)
Median by TxDOT district
| District | Low bids | Median unit price |
|---|---|---|
| Lubbock | 3 | $60.00 |
| Odessa | 3 | $100.00 |
| Wichita Falls | 1 | $25.00 |
| Beaumont | 1 | $150.00 |
| San Angelo | 1 | $55.28 |
| Abilene | 1 | $235.00 |
Most recent low bids
| Let date | CCSJ | County | District | Qty | Low unit price | Engineer's est. |
|---|---|---|---|---|---|---|
| 2026-11-03 | 0044-06-079 | Montague | Wichita Falls | 378 | $25.00 | $150.00 |
| 2026-08-06 | 0168-03-038 | Parmer | Lubbock | 10 | $63.00 | $60.00 |
| 2026-03-05 | 0905-00-132 | Lubbock | Lubbock | 152 | $60.00 | $60.00 |
| 2025-11-06 | 0028-04-083 | Liberty | Beaumont | 4 | $150.00 | $60.95 |
| 2025-10-09 | 0479-04-055 | Winkler | Odessa | 16 | $100.00 | $60.00 |
| 2025-10-08 | 0076-07-037 | Upton | Odessa | 6 | $110.00 | $200.00 |
| 2025-09-04 | 0077-06-107 | Tom Green | San Angelo | 71 | $55.28 | $185.00 |
| 2025-07-01 | 6482-23-001 | Pecos | Odessa | 12 | $42.53 | $75.00 |
| 2025-07-01 | 0181-01-067 | Taylor | Abilene | 19 | $235.00 | $75.00 |
| 2025-03-05 | 0905-00-131 | Lubbock | Lubbock | 78 | $21.39 | $60.00 |
Quantities matter: small quantities often carry higher unit prices. Lump-sum (LS) items are whole-job amounts. Compare projects of similar size before using a number.
Source: TxDOT Bid Tabulations, bid code 668-7038 on the Texas Open Data Portal, retrieved 2026-11-26. JSON: /api/v1/tx/items/668-7038.json