Unit Price Desk TX
Informational only: Figures come from TxDOT's public Bid Tabulations file: bids as read at letting, not award records. They may contain errors. Not bid, cost-estimating or engineering advice. Verify with TxDOT before relying on any number.

TxDOT item 690-7008: INSTALL OF GROUND BOXES

Unit: EA. Apparent low-bid unit prices for this item across 8 TxDOT lettings from 2025-02-12 to 2026-11-03.

Last 24 months

9Low bids
$2,000.00Median
$1,130.5025th pct
$2,054.0075th pct
$1,344.82Qty-weighted avg
$800.00 / $2,850.00Min / max
$1,407.69Engineer's est. median
107.6%Low ÷ estimate (median)

Last 12 months

5Low bids
$2,000.00Median
$1,515.2025th pct
$2,054.0075th pct
$1,518.84Qty-weighted avg
$1,100.00 / $2,850.00Min / max
$1,310.00Engineer's est. median
129.0%Low ÷ estimate (median)

Median by TxDOT district

DistrictLow bidsMedian unit price
Bryan2$1,990.25
Brownwood2$2,094.50
Austin1$1,515.20
Paris1$1,100.00
San Antonio1$2,054.00
Yoakum1$2,000.00
Houston1$800.00

Most recent low bids

Let dateCCSJCountyDistrictQtyLow unit priceEngineer's est.
2026-11-030015-13-432TravisAustin7$1,515.20$1,407.69
2026-04-166497-30-001LamarParis10$1,100.00$1,171.07
2026-04-072452-01-066BexarSan Antonio2$2,054.00$1,200.00
2026-03-050913-00-136De WittYoakum1$2,000.00$1,550.00
2026-02-106496-33-001BrazosBryan2$2,850.00$1,310.00
2025-09-056475-53-001HarrisHouston20$800.00$665.13
2025-05-086478-34-001BrownBrownwood5$2,000.00$2,570.00
2025-03-206478-34-001BrownBrownwood5$2,189.00$2,570.00
2025-02-126478-23-001BrazosBryan2$1,130.50$1,510.00

Quantities matter: small quantities often carry higher unit prices. Lump-sum (LS) items are whole-job amounts. Compare projects of similar size before using a number.

Source: TxDOT Bid Tabulations, bid code 690-7008 on the Texas Open Data Portal, retrieved 2026-11-26. JSON: /api/v1/tx/items/690-7008.json