Unit Price Desk TX
Informational only: Figures come from TxDOT's public Bid Tabulations file: bids as read at letting, not award records. They may contain errors. Not bid, cost-estimating or engineering advice. Verify with TxDOT before relying on any number.

TxDOT item 8000-7105: AGGR (TY B GR 4) (DEL) (ST7)

Unit: TON. Apparent low-bid unit prices for this item across 11 TxDOT lettings from 2025-02-19 to 2026-10-22.

Last 24 months

11Low bids
$71.70Median
$65.1225th pct
$83.4975th pct
$77.59Qty-weighted avg
$57.75 / $97.25Min / max
$81.59Engineer's est. median
99.2%Low ÷ estimate (median)

Last 12 months

6Low bids
$69.58Median
$63.9625th pct
$78.6075th pct
$73.08Qty-weighted avg
$57.75 / $86.08Min / max
$81.53Engineer's est. median
92.8%Low ÷ estimate (median)

Median by TxDOT district

DistrictLow bidsMedian unit price
Atlanta3$86.08
Paris2$71.01
Wichita Falls2$62.30
Brownwood1$67.45
Fort Worth1$57.75
San Angelo1$80.11
Tyler1$97.25

Most recent low bids

Let dateCCSJCountyDistrictQtyLow unit priceEngineer's est.
2026-10-226510-55-001BrownBrownwood1.5e+03$67.45$78.00
2026-08-126503-48-001HarrisonAtlanta1.26e+03$80.90$81.59
2026-08-066506-23-001GraysonParis2e+03$71.70$70.32
2026-06-176502-22-001WichitaWichita Falls500$62.80$81.47
2025-12-026493-25-001JackFort Worth650$57.75$84.00
2025-12-026493-01-001HarrisonAtlanta1.26e+03$86.08$82.08
2025-11-196493-30-001RunnelsSan Angelo200$80.11$83.47
2025-08-076487-80-001GraysonParis2e+03$70.32$60.00
2025-07-026482-87-001HarrisonAtlanta1.26e+03$87.86$82.08
2025-06-056482-60-001SmithTyler2.1e+03$97.25$110.00
2025-02-196476-42-001WichitaWichita Falls500$61.80$60.00

Quantities matter: small quantities often carry higher unit prices. Lump-sum (LS) items are whole-job amounts. Compare projects of similar size before using a number.

Source: TxDOT Bid Tabulations, bid code 8000-7105 on the Texas Open Data Portal, retrieved 2026-11-26. JSON: /api/v1/tx/items/8000-7105.json